A single 5MW BESS (Battery Energy Storage System) can power 1,500 homes for 2 hours – enough to prevent blackouts during peak demand. Imagine a wind farm generating 30MW at night but only 5MW during daylight.
Use this TradeOff Tool to estimate the power required by a data center with traditional, or AI/HPC servers. Configure different server, storage, and design attributes to explore different scenarios.
Each cabinet is factory pre-assembled and pre-commissioned, cutting on-site installation costs by 40% and system commissioning time by 60%, enabling faster project delivery and reduced labor demands. Each system supports parallel connection of up to 10 units, enabling.
The energy storage cabinet has a long lifespan of 10 years, protective class reaches IP54, with a forced air cooling method, over 6000 cycle times at 80% DOD, 25℃. We offer a warranty of standard 60-month warranty from the delivery date.